Halls Hub Tunnel

2025

Client: NRW

Construction of:

  • 2 x 100m footings
  • 200m of L bracket cast ins
  • Corrugated steel tunnel 9m span
  • 12,000 bolts torqued
  • 0 LTIs
  • Works completed ahead of schedule
  • 100% self perform 
  • 4% aboriginal engagement
Scroll to Top
Secret Link